1t Wire Rope Electric Hoist for Overhead Crane

1t Wire Rope Electric Hoist for Overhead Crane

Nucleon Wire Rope CZPT CZPT

Transient Introduction:

ND series metal wire rope electric powered hoist is equipment to the newest CZPTpean FEM planning regular with advanced principle, beautiful appearance. The push device adopts demestic innovative position line meshing equipment construction producing the machine has compact sensible composition. The procedure is simple, practical and doing work is basic safety and productive and fulfill the minimal noise,energy conservation and atmosphere protection requirments.

This series of electric powered hoist utilized 11patent technologises.This sequence of goods are made with frequency handle of motor speed, small affect and it can realizr exact positioning. Equipped with smart monitoring recorder which is equivalent to the “black box” of aircraft,it can uninterruptedly report crane operating position information and stop untrue procedure.The device use routine maintenance totally free design and style with small vulnerability and hassle-free maintenance.The overal specialized level has arrived at the innovative stage of related products residence and overseas.

Factors Descriptions:

1. 3-in-one tough surface area twin-velocity lifting drive unit.
two. three-in-1 difficult surface trolley with frequency conversion drive unit
three. Computerized dress in detection brake
4. 4-phase adjustable rotation lifting limit swap

Samples Photographs:

Specifications Chart:
 

Capability
(t)
Function Class Top
(m)
Carry Speed
(m/min)
Vacation Velocity
(m/min)
Beam Width
(mm)
Max Wheel Load
(KN)
Fat
(kg)
1.six M4-M6 <15 one.six/10 2-twenty 200-three hundred six.20 335
2.five M4-M6 <15 .8/5. 2-20 two hundred-350 9.twenty 350
three.two M4-M6 <15 .8/5. 2-twenty 250-350 11.sixty 370
6.3 M4-M6 <15 .8/five. two-twenty 300-450 22.ten 450
8 M4-M6 <15 .8/5. two-20 300-450 28.twenty 610
ten M4-M6 <15 .8/5. two-20 300-450 34.eighty 640
twelve.5 M4-M6 <15 .sixty six/four. 2-20 three hundred-500 forty three.40     700

What are critical to choose a proper hoist:

1. CZPT Capability
two. Lifting Peak
three. CZPT Software and Operate Course
four. CZPT Traveling Size
5. Management Technique: Pendant or Remote Manage?
six. Regional Power Supply: AC 240/380/400/415/440v fifty/60hz
7. Amount
eight. Desitination Port

Welcome to Check out Our Manufacturing unit before Producing up Your Head!
 

1t Wire Rope Electric Hoist for Overhead Crane