Bucket Chain Dredger Gold Mining Dredger

Bucket Chain Dredger Gold Mining Dredger

CZPTdredging Bucket Chain dredger

1.Business Profile

HangCZPT CZPT Dredging Heavy Business Co., Ltd. is specialized in researching, manufacturing and offering cutter suction dredger, wheel bucket dredger, jet suction dredger, bucket chain dredger,  multi-perform provider perform boat ,sand transportation ship and many others, which are widely utilised in sand mining, river dredging, desilting, gold/diamond mining , port construction etc. All the products can be CZPT according to client’s prerequisite.

We have specialist R&D section, CAD drawing style center, high quality control office, right after-product sales provider department, running and getting division and solution testing heart. Our business has far more than 200 staff, like 5 specialist senior engineers on dredger creating and studying, and much more than twenty five intermediate quality specialized staff. They specialize in creating and building dredgers and sand mining equipment.

In latest several years, our dredgers and gold mining gear have been productively exported to Malaysia, Pillippines, Indonesia, Bangladesh, India, Brazil, Xihu (West Lake) Dis.via, Benin, Egypt, Nigeria, Cango, Liberia, Tanzania, Sultan , Russia ,Ukraine, Iran, Saudi Arabia, Pakistan, and North Korea, and many others.. 

2.Solution Description

Bucket chain dredgers have great capacity to fit diverse sorts of  geologic structure. With the advantages of stable overall performance, lengthy working life,lower price, substantial effectiveness and small upkeep, its pontoon adopts the assembled box construction, which is equipped with excavation gadget, lifting unit, huge particle filter system, transmission system, transfer unit, excavated sediment supply to the sand transportation ship by the conveyor belt. The method including mining sand separation, stone broken, stone grading, sediment washing separation, weighty metal extraction, dehydration, transportation and so on. bucket chain dredger is suitable for salt mining, gold/diamond mining, hard riverbed exploiting and channel cleHangCZPT.

3.Solution Software

    1.Sand mining,
   2. Gold/diamond mining

   3.Salt mining

   4.Challenging riverbed exploiting

   5.River/lake desilting

 

four.High definition-BCD100 Bucket Chain Dredger 100m3/h

 Bucket chain dredger can be CZPT in accordance to the need of the clients.
 

Design High definition-BCD100
LOA 29m
Hull measurement(LxWxH) twenty five.0x6.0x1.0m
Main engine brand name CZPT
Primary motor power 105kw
Max. dredging depth 20m
Draught .7m
Max. potential 100m3/h
Chain bucket qty. 100pcs
Chain bucket pace fifteen.2m/min
Chain dimension 700x100x30mm

five.Maintenance and Assist

  1. Right after supply we ship two skilled engineers who will be to manual setting up and teach local workers.
  2. Assist spare parts are in stock.
  3. We offers a handy way for you to get parts. You can basically select the elements you need in accordance to your specs and have them shipped right to your internet site.
  4. twelve months manufacturing guarantee on all new mounted element components.
  5. 12 months warranty on engine.
  6. twelve months warranty on hull and all fabricated areas.
  7. In the occasion that our buyers dredging expertise unskilled or mechanical failure or they just need to shoot a minor issue, our engineers are CZPT at customer’s providers, there are always engineers for installation and education if consumers wants.

 

6.Our Workshop

seven.Manufacturing facility Generation Line

8.Our Situation

   
9.Patent Certificate

10.Other Goods

eleven.FAQ

one. Planning perform ahead of Dredger Testing
   1) CZPTers will be invited to watch dredger test , radio and photographs will electronic mail to          buyers.
   2) CZPTy parts and connections of dredger must be checked strictly prior to check.
   3) Oil and cooling water ought to be completely ready for dredger test.
2. Pontoons Welding
    Making use of welding failure detector to examine the welding good quality.
three. Dredger Painting
    Our dredger development elements are of shot blasted plate with store primer. Dredger after design and assembly all rusty surfaces, welding spots and damaged store primer will be cleaned and coated with primer.
4. No-load Test
   1) All the major products, which includes Engine, Gearbox, Pump, CZPT technique.
   2) CZPT method, are tested for at least 2 several hours in manufacturing facility.
   3)All the suppliers of the main areas ought to be on the spot to solve any difficulty.
5. Dismounting and Packing
   1)All the areas are marked before dismounting.
   2)All the small components are put into packaging box with a packing checklist.
   3)All the hydraulic pumps and pipes joints are packed by plastic wrap.
   4)CZPTy part ( no issue how small ) is registered on the packing checklist.

twelve.Get in touch with Way:

 

Bucket Chain Dredger Gold Mining Dredger