Factory Direct Sale Double Layer Roll Forming Machine

Factory Direct Sale Double Layer Roll Forming Machine

                    CZPT Layer Roll Forming Machine 
                   For YX25-760 & YX18-760 Profile 
       

Profile 
Upper Layer

Down Layer

Content
Powerful width: 760/760 mm                           
Feeding width: about 914/914 mm                
Substance Thickness: .3-.6mm                                           
Relevant materials:Prepainted Galvanized Steel(PPGI)  
With yield power 235-390Mpa                               
 

Guide Pre-Cutter

Main Equipment
body body manufactured from H450 sort steel by welding
Side wall thickness: Q235 t20mm
Rollers produced from 45# Steel,CNC lathes,Warmth Treatment method,hard Chrome Coated
Equipment/Sprocket driving,about 18-phase(Upper Layer)/eighteen-action(Down Layer) to sort
Principal Motor=11KW,Frequency pace manage
Chain: ZIQIANG (by China Best 1 brand XIHU (WEST LAKE) DIS.HUA Group)
All the screw bolts with quality eight.eight
Actual forming speed 18-25 m/min(Not incorporate cutting time)

Submit CZPT Chopping Device
Post to cut, end to cutting,Three pieces type of slicing blade design, no blanking
CZPT motor:5.5 KW 
Reducing resource material: Cr12MoV
The slicing power is provided by the main engine hydraulic station

PLC Management System
Input The Manufacturing Info(Production Batch,pcs,Duration,etc.)On The Contact Display ,
It Can Finish The Creation Instantly.
PLC:Siemens(Germany manufacturer)/Schneider(French model)
Inverter:Siemens(Germany brand)/Schneider(French model)
7-Inch Color Contact Display screen:Siemens(Germany manufacturer)/Schneider(French manufacturer)
Encoder: Omron (Japan brand)
Switch Bottom, Reveal Light-weight, Power Offer, Intermediate Relay, AC Contactor,
Thermal Relay: Siemens(Germany brand name)/Schneider(French brand name)
Air Switch: LG-LS(Korea brand)
Minimize-to-Length Tolerance≤±1 mm
Manage Voltage 24V

Product SAMPLE

Soon after-Sale Provider
1. The warranty is 24 months after the client receives the machine.
Within The 24months, we will courier the replacement parts to the client
 free of charge 
2.We offer technical support for the entire life of our machines
3. We can send our technicians to install and train the workers in the clients’ factories with extra cost

Phrases Of Trade
1.Minimum order quantity (MOQ): 1 Set
2.Delivery time: about 45 workdays
three.Port of loading: port of HangCZPT
4.Type of payment: by T/T or by L/C
five.Export:to far more than 60 countries and regions, such as ZheJiang , Uk, France, Singapore,
Greece, Australia, USA, Mexico, Brazil, Chile, Xihu (West Lake) Dis.by means of, Trinidad, Israel, Saudi Arabia, and so on

Packing Type
Packing technique: Main entire body of machine is bare and covered by plastic movie(to defend of dust and corrosion),
loaded into container and steadily fastened in container ideal by metal rope and lock, suitable for extended-distance transportation.

Generating time: about 50 workdays after received the advance payment
Packing method: with nude packing steadily mounted in one 40 ft container appropriate for
lengthy-distance transportation
ABOUT US
Brand name FORMING CZPT CO.,LTD
HangCZPT BMS Building Technology CO.,LTD(BMS)

EXHIBITION

Manufacturing unit

Certificate

CZPTer

                                                 QUALITY IS OUR Society!
                           WITH US YOUR Cash IN Secure,
                               YOUR BUINESS IN Safe!

                     IF U ARE Intrigued OUR MACHINES 
                           PLEASE Make contact with WITH ME!
          

 

Factory Direct Sale Double Layer Roll Forming Machine